1 00:00:01,001 --> 00:00:01,725 The hardware we are looking at it is 2 00:00:01,760 --> 00:00:03,203 called the MPCV Stage 3 00:00:03,238 --> 00:00:05,044 Adapter. It’s a piece of 4 00:00:05,079 --> 00:00:06,052 hardware that we 5 00:00:06,087 --> 00:00:07,052 are going to use on a test 6 00:00:07,087 --> 00:00:08,372 flight to adapt the Orion 7 00:00:08,407 --> 00:00:10,700 Capsule to a Delta heavy launch 8 00:00:10,735 --> 00:00:12,052 vehicle. So since 9 00:00:12,087 --> 00:00:13,139 this is flight hardware 10 00:00:13,174 --> 00:00:14,628 the moving operations 11 00:00:14,663 --> 00:00:15,891 are very critical, because 12 00:00:15,926 --> 00:00:17,035 it’s only one flight 13 00:00:17,070 --> 00:00:18,147 asset and we want to make 14 00:00:18,182 --> 00:00:19,859 sure that we treat it 15 00:00:19,894 --> 00:00:21,404 and take care of it so we don’t 16 00:00:21,439 --> 00:00:22,524 damage it. So what 17 00:00:22,559 --> 00:00:25,012 we did to flip it is we 18 00:00:25,047 --> 00:00:26,252 put the MSA hardware 19 00:00:26,287 --> 00:00:27,724 on an assembly jig which is 20 00:00:27,759 --> 00:00:28,580 to keep the ring 21 00:00:28,615 --> 00:00:29,844 stable. Then we mounted it 22 00:00:29,879 --> 00:00:31,371 with blocks and then 23 00:00:31,406 --> 00:00:32,955 used a Possi-turner machine to 24 00:00:32,990 --> 00:00:35,004 flip the MSA 108 25 00:00:35,039 --> 00:00:36,820 degrees to be able to put it 26 00:00:36,855 --> 00:00:37,972 on a seven axis milling 27 00:00:38,007 --> 00:00:38,996 machine. All the different 28 00:00:39,031 --> 00:00:40,948 bolts that were used 29 00:00:40,983 --> 00:00:42,972 for the planting mechanism 30 00:00:43,007 --> 00:00:45,123 needed to be clamped to a 31 00:00:45,158 --> 00:00:47,356 specific torque to make sure 32 00:00:47,391 --> 00:00:48,228 that it was 33 00:00:48,263 --> 00:00:50,076 fastened correctly, but at the 34 00:00:50,111 --> 00:00:51,084 same time we don’t 35 00:00:51,119 --> 00:00:52,899 want to over torque it so we 36 00:00:52,934 --> 00:00:54,068 end up damaging the 37 00:00:54,103 --> 00:00:55,755 hardware. So, there is a 38 00:00:55,790 --> 00:00:56,868 specific torque value 39 00:00:56,903 --> 00:00:58,940 that you want to make sure that 40 00:00:58,975 --> 00:00:59,908 it’s safe in 41 00:00:59,943 --> 00:01:01,292 place, but like I say, don’t 42 00:01:01,327 --> 00:01:02,388 damage the hardware! 43 00:01:02,423 --> 00:01:03,500 So my involvement with the 44 00:01:03,535 --> 00:01:04,740 project was the 45 00:01:04,775 --> 00:01:07,699 flipping of the fixture, so the 46 00:01:07,734 --> 00:01:09,187 tool that we used to flip 47 00:01:09,222 --> 00:01:12,748 the MSA was an existing tool 48 00:01:12,783 --> 00:01:16,484 that we had but it had to be modified in 49 00:01:16,519 --> 00:01:17,948 order to accommodate to 50 00:01:17,983 --> 00:01:19,484 the MSA. So I was involved 51 00:01:19,519 --> 00:01:21,796 with the design of 52 00:01:21,831 --> 00:01:23,827 the blocks and the clamps 53 00:01:23,862 --> 00:01:25,355 that were used to put the 54 00:01:25,390 --> 00:01:27,187 MSA on the tool that we used 55 00:01:27,222 --> 00:01:31,668 to flip. So today I 56 00:01:31,703 --> 00:01:32,948 saw some of my work in 57 00:01:32,983 --> 00:01:34,212 operation…it was great 58 00:01:34,247 --> 00:01:36,076 to have something that went 59 00:01:36,111 --> 00:01:37,860 from my design board 60 00:01:37,895 --> 00:01:39,315 to the actual manufacturing 61 00:01:39,350 --> 00:01:40,580 and then to be used on 62 00:01:40,615 --> 00:01:42,467 a piece of flight hardware. 63 00:01:42,502 --> 00:01:46,091 So what they will do on 64 00:01:46,126 --> 00:01:47,123 the milling machine is they 65 00:01:47,158 --> 00:01:48,084 will machine both the 66 00:01:48,119 --> 00:01:49,388 forward and the aft flanges of the 67 00:01:49,423 --> 00:01:50,836 adapter and then they will 68 00:01:50,871 --> 00:01:52,220 put all the flight holes and those 69 00:01:52,255 --> 00:01:54,212 will be used to mount the MSA